/
MASTER-->PRODUCTION UNIT

MASTER-->PRODUCTION UNIT

If there is more than one production unit in a location, then multiple production units can be created in this module. 

In this document, we will understand how to create different production units.

Create Production Unit 

STEP 1: To create multiple production units for a location, firstly while creating the location, tick the following two checkboxes as shown in the picture.

  • Production Allowed

  • Multiple Production

 

STEP 2:  Go to HOUSE --> MASTER --> PRODUCTION UNIT. The Page displays all production units that have been created in the system.

 

STEP 3: To create a new production unit, click CREATE PRODUCTION UNIT. Select the location from the drop-down list to create the Production Unit under the location. Add the code and name for the production unit. 

http://docs.dineplan.net/uploads/images/gallery/2019-12/scaled-1680-/nHX2-create.PNG

 

Related content